Pengembangan Penjadualan Job Shop Inserted Idle Time dengan Schedulling Graph untuk Meminimasi Biaya Tardiness & Earliness
Oleh:
Dewi, Dian Retno Sari
;
Maukar, Anastasia Lidya
Jenis:
Article from Journal - ilmiah nasional
Dalam koleksi:
Widya Teknik vol. 4 no. 2 (Nov. 2005)
,
page 59-66.
Topik:
job shop
;
backward
;
scheduling graph algorithm
;
insert idle time
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
WW33.1
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
This research develops job shop schedulling using a non-delay backward algorithm to minimize total earliness and tardiness costs. Backward approach has some disadvantages. For example, there is a possibility that the infeasible situation occurs, in which the job is scheduled at t < 0. Thus, the infeasible job (scheduled at t < 0) is forwarded till t = 0 using a non-delay backward algorithm by using Schedulling graph and Insert idle time. This job shop scheduling algorithm was validated using the LINDO software to check the effectiveness of heuristic method and to compare the results with the optimization method.