Anda belum login :: 18 Dec 2025 13:17 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Factory plastic bag layout design in elite recycling Indonesia extension
Oleh:
Gozali, Lina
;
Marie, Iveline Anne
;
Andriani, Prisca
Jenis:
Article from Proceeding
Dalam koleksi:
PROCEEDING The 8th International Seminar on Industrial Engineering and Management (8th ISIEM). Atria Hotel & Conference, Malang, Indonesia March 17 – 19, 2015
,
page PS-1.
Topik:
Plant Layout
;
;
SLP
;
Relationship Diagramming
;
MHES
Fulltext:
Paper 01 Lina Gozali - Tarumanagara University.pdf
(603.19KB)
Isi artikel
Plastic bags help people in everyday life. PT. Elastis Reka Aktif (ERA Plastik) is one of the industry engaged in manufacturing plastics. In 2014, PT. ERA plastik wants to expand to meet the needs of the market by opening a new plant with a capacity of 300 tons per month located at Jl. Raya Gema Lapik, South Cikarang which has a land area of 6000 m2 and a building area of 2200 m2. To meet this need, this research aims to design the layout of a new plastic bag factory based approach Systematic Layout Planning (SLP). Based on the data input activities planned for the plant, the routing calculation sheet to determine the needs of the number of machines on the production floor, followed by the determination of manufacturing activities as well as facilities to support the needs of area calculation for each manufacturing facility. Next, performed linkage analysis between overall plant facility designed in Activity Relationship Chart (ARC) Plant. Based on the close relationship ARC Factory, design layout is done by using an algorithmic approach Relationship diagraming method to get the draft Activity Relationship Diagram (ARD) as a basis for designing factories Area Allocation Diagram (AAD) Plant. Because of the available land has limited, the design of the layout of the factory developed into three alternative layouts drawn using Autocad software 2010. Alternative layout will be evaluated quantitatively by calculating the values of closeness scores and use the checklist Material Handling Evaluation Sheet. Alternative selected layout will be created in the form of templates and 3 dimensions.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0 second(s)