Anda belum login :: 16 Apr 2025 11:16 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Formulating Risk Mitigation Strategies on the Engineering, Procurement and Construction (EPC) Project in Mini Hydro Power Plant Development
Oleh:
Roeshardianto, Prabono
;
Siregar, Hermanto
;
Lukytawati
Jenis:
Article from Journal - ilmiah nasional - terakreditasi DIKTI
Dalam koleksi:
Jurnal Aplikasi Manajemen vol. 13 no. 2 (Jun. 2015)
,
page 175 - 185.
Topik:
mitigation strategy
;
Risk identification
;
mini hydro EPC project
;
AHP
;
RI
Fulltext:
759-2006-1-PB.pdf
(1.54MB)
Isi artikel
The demand for electricity in Indonesia has been escalating rapidly for the past years. One of the priorities to fulfill the demand is by developing mini hydro power. However, the potential risk of implementation can arise at any stages of EPC process. XYZ is a EPC contractor company facing problems in managing risk. The objectives of this study are to identify risks and measuring the magnitude of the risk and develop effective risk mitigation strategies. Data analysis was conducted by determining the relative importance index (RII). There are 12 factors (22,64%) were categorized as very significant risks (80 RII 100). The respondent considers that the level grade in reliability and availability plant are the highest risk factor. The twelfth rank was taken by inaccuracy of engineers’ estimations during the preparation of material take over (MTO)/bill of quantity (BQ). Improvement in the company’s human resources is a major concern of the respondents, because the main weight of the respondent’s assessment of the strategy group was the dominant risk factor based on analitical hyrarchy process (AHP).
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)