Anda belum login :: 29 Apr 2025 05:31 WIB
Detail
ArtikelMCB: Implementation of the Symbols Project  
Oleh: Saeed, Khawaja Asjad ; Shaikh, Shazib E.
Jenis: Article from Journal - ilmiah internasional
Dalam koleksi: Asian Journal Of Management Cases vol. 09 no. 02 (Sep. 2012), page 99–114.
Topik: nformation systems implementation; banking systems; enterprise systems; process change management; systems integration; case study
Fulltext: Asian Journal of Management Cases-2012-Saeed-99-114_dan.pdf (2.03MB)
Isi artikelThis is a case that facilitates learning about IT-enabled change management. It tracks both the decision to convert to a $1.7 million banking enterprise system and its roll-out between 2002 and 2008. The project was met with resistance by the branches of this major nationwide bank to the point that in 2005 the project team was completely reorganized and a new Senior Vice President (SVP) position was created specifically for the project. The new system would lead to more centralization and integration with faster inter-branch processing as compared to the previous system which granted branches more autonomy in inter-bank transfers and employees only interacted with the system through data operators. Recognizing customers at the bank level and not just at branch level was an important objective. The complete project reorganization allows readers to understand the need to appreciate certain factors that may be deemed as trivial, especially where top-down IT enabled change is being implemented. At the end of t he c ase, t he p roject i s s till i n p rogress w ith 8 18 b ranches ( 76 p er c ent) c onverted t o t he n ew s ystem.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0 second(s)