ArtikelTransformer Commissioning at Central India Oil Refineries Ltd (CIORL)  
Oleh: Kapoor, Rohit ; Jain, Nikunj Kumar
Jenis: Article from Journal - ilmiah internasional
Dalam koleksi: Asian Journal Of Management Cases vol. 11 no. 02 (Sep. 2014), page 103–118.
Topik: Project management; refinery; commissioning; CPM; PERT; cost versus time trade-off analysis
Fulltext: Asian Journal of Management Cases-2014-Jain-103-18_dan.pdf (512.46KB)
Isi artikelThe case describes the uncertain and unavoidable events that delayed the commissioning of a trans-former at Central India Oil Refineries Ltd. The project was not being executed as planned, resulting in the delay of almost all the activities. The commissioning of the transformer had become the bottleneck of the refinery because all the pre-commissioning and commissioning activities of the refinery required steam and power, which were in turn dependent on the transformer. Project management tools such as the critical path method and programme evaluation and review technique were used to analyze the time required for the completion of the commissioning of the transformer and resource reallocation for speeding up the project. A cost versus time trade-off analysis was applied to determine the activities to be crashed in order to produce the maximum overall job profit.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0 second(s)