Anda belum login :: 03 Jun 2025 09:04 WIB
Detail
BukuThe relationship between empowering leadership and project performance: a resource perspective
Bibliografi
Author: Zheng, Junwei ; Gu, Yu ; Li, Hongyang ; Li, Peikai ; Xie, Hongtao ; Zhang, Zhenduo
Topik: empowering leadership; creative self-efficacy; leader-member exchange; perceived overqualification; project performance; conservation of resources theory
Bahasa: (EN )    
Penerbit: Emerald Publishing Limited     Tempat Terbit: United Kingdom    Tahun Terbit: 2023    
Jenis: Article - diterbitkan di jurnal ilmiah internasional
Fulltext: Zheng (2023).pdf (599.25KB; 0 download)
[Informasi yang berkaitan dengan koleksi ini di internet]
Abstract
Purpose
While existing literature emphasizes the importance of empowerment in construction projects, the working mechanisms of empowering leadership in the project context are unclear. Based on conservation of resources (COR) theory, this study aimed to examine the relationship between empowering leadership and project performance, highlighting the mediation roles of creative self-efficacy and leadermember exchange and the moderation role of perceived overqualification.

Design/methodology/approach
The authors collected data from 287 project members in different projects and tested the integrated conceptual model through moderated mediation analysis with bootstrapping strategy.

Findings
The results revealed that empowering leadership was positively related to project performance through creative self-efficacy and leader–member exchange. Perceived overqualification served as significant moderator.

Originality/value
The findings contribute to the understanding of empowering leadership in projects by verifying and extending the resource acquisition and investment process in the project context. The results of this study also demonstrated that creative belief and social exchange facilitate the effectiveness of project members' task efforts and outcomes and that perceived overqualification might not exert a detrimental effect on project performance.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.078125 second(s)