Anda belum login :: 16 Dec 2025 16:19 WIB
Detail
ArtikelDesigning Enterprise Resources Planning Application for Integrating Main Activities in a Simulator Model of SCM Network Distribution  
Oleh: Hisjam, Muh. ; Yuniaristanto, Wahyudi Sutopo ; Hakim, Inaki Maulida
Jenis: Article from Proceeding
Dalam koleksi: APCOMS 2009: The 2nd Asia-Pacific Conference on Manufacturing System: Reconfigurable Manufacturing System for Facing Turbulent Manufacturing Environment, November 4th-5th, 2009, Yogyakarta, Indonesia, page III.7-14.
Topik: Distribution Network; Enterprise Resource Planning; Industrial Engineering Education; SCMSimulator; and Learning Media
Fulltext: APCOMS G3-2.pdf (969.89KB)
Isi artikelCollaborative supply chain is a specific topic in supply chain management and studied by industrial engineering students in supply chain management course. Unfortunately, conventional learning media cannot explain the phenomenon of collaborative supply chain to the students. This study aimed to design a dynamiclearning media so that inter-company collaboration and information sharing on the activities of Supply Chain entities can be explained effectively to the students. The problem was solved using 3 (three) steps. First, the distribution network was described using mock up. It consists of miniature trucks, miniature network and miniature of the manufacturer-distributor-retailer embedded with tag and reader of RFID. Second, the Enterprise Resources Planning application was developed for supporting business activities. Third, we developed the integrator consists of monitor’s user interface and practice modules. The result of the research - an SCM-Simulator – will be able to improve learning skills of industrial engineering graduates, especially abilities to identify, formulate, and solve the activities of tactical plan & operational routines of Supply Chain entities. However, distribution module designed is for limited scale laboratory study of simple objects.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)