Anda belum login :: 15 Apr 2025 14:25 WIB
Detail
ArtikelDraw Point Construction Improvement Using Six Sigma  
Oleh: Basri, Mursyid Hasan
Jenis: Article from Journal - ilmiah nasional - terakreditasi DIKTI
Dalam koleksi: Jurnal Manajemen Teknologi vol. 8 no. 1 (2009), page 1-18.
Topik: Completion time; Process Quality; Six Sigma; DMAIC.
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: MM77
    • Non-tandon: 1 (dapat dipinjam: 0)
    • Tandon: tidak ada
    Lihat Detail Induk
Isi artikelDraw point is a loading point beneath a stope, utilizing gravity to move down bulk material in Underground Mine Block Caving of PT Freeport Indonesia. A draw point is a steel set that is erected and poured in place with concrete. There are 9 sub processes of draw point construction: site preparation, lean concrete, embedded rail, concrete floor, anvil top, lintel set, forming & meshing, wall & roof concrete, stripping & general clean-up. Based on data analysis period 2008, there is a gap 4.03 unit draw point of yearly target with average of completion time of a draw point construction 46.44 shifts and standard deviation 6.95 shifts. It is slower by 9.7% of target 42 shifts. The high standard deviation and slower process indicate there is a process quality problem in draw point construction so it makes draw point construction incompliance to achieve its monthly or yearly target. For improving the process quality, six sigma approach with DMAIC methodology will be used to identify incapable process and its causes. Then alternative solutions are proposed to fix it and control the key process variables causing the defects.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0 second(s)