Anda belum login :: 05 Jun 2025 01:52 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Penjadwalan Produksi di CV. Jati Agung Furniture
Oleh:
Susanti, Herdiana Dyah
Jenis:
Article from Journal - ilmiah nasional
Dalam koleksi:
Jurnal Ilmiah Sains dan Teknologi vol. 02 no. 03 (Jun. 2007)
,
page 139-152.
Topik:
Schedule Production
;
Furniture
;
Set Up
;
Mean Tardiness
Ketersediaan
Perpustakaan PKPM
Nomor Panggil:
J110
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
This research is for particular company in furniture scope which is all of produced by job order system. For the time being the company oftenly couldn't fulfil the order from the consument on time. It was because the company scheduled the products based on the biggest product volume if the order came on the same day withoud paid any attention to due date which are agreed both by consument and the company. This research is done by improving the set up method with SMED method, Finishing time model, a better scheduled with EDD and SPT methode for regular job and MWKR rul. The result showed that by scheduling proposak was gotten of descreasing mean tardiness from 0,667 the postpone day (delayed day) become no delayed.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0 second(s)