BukuPerancangan Ulang Tata Letak Lantai Produksi Dengan Pendekatan Product Layout (Studi Kasus: PT. Kabelindo Murni)
Bibliografi
Author: GRACIA, JESSICA EUNICHA ; Hutahaean, Hotma Antoni (Advisor)
Topik: Product Layout; ATBD; BLOCPLAN
Bahasa: (ID )    
Penerbit: Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2017    
Jenis: Theses - Undergraduate Thesis
Fulltext: Jessica Eunicha Gracia’s Undergraduate Theses.pdf (5.26MB; 45 download)
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTI-1336
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
At this time Kabelindo Murni Ltd using process layout for their production area which is they arrange production machines that have the same function into the same area. As time goes by process layout is considered no longer efficient and economic for being used in the future. Production machines placement that does not arrange by process production order gives an impact that the distance between one machine to another is too far for material handling to carry work-in-process product. This condition can make production process does not run well. Beside that it can increase the material handling cost. This is a loss for the company. Therefore Kabelindo Murni Ltd has a plan to redesign their production area to be a product layout, where production machines will be placed as production process order. The methods that used to make the redesign are ATBD and BLOCPLAN. ATBD with outflow coefficient is chosen to be the best method for Kabelindo Murni Ltd if compared with BLOCPLAN. Material handling cost that generated from calculation with this method is Rp 6.163.968 and the total distance between production machine is 7.212. It decrease a lot from the current material handling cost and total production machine distance which are Rp 16.503.176 and 12.814.