Anda belum login :: 16 Apr 2025 23:29 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Muara Bekasi - Muara Tawar Offshore Transmission Pipeline Routing and Economic Analysis
Oleh:
Saputra, Asep Handaya
;
Ardiansyah
Jenis:
Article from Journal - ilmiah nasional - terakreditasi DIKTI
Dalam koleksi:
Makara Journal of Technology vol. 13 no. 1 (Apr. 2009)
,
page 37.
Topik:
Gas Transmission
;
Offshore
;
Pipe Stability
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
MM64.2
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
Power plant Muara Tawar will substitute the need of oil fuel to gas as form of economizing and energy conservation. The nearest supply point to fulfill natural gas needed on Muara Bekasi. So that Power Plant Company needed to develop gas pipeline infrastructure to joining the point.The purpose of this study is to create a system of gas transmission pipeline from gas supply point at Muara Bekasi to Power Plant Muara Tawar trough to offshore area. Design of gas transmission pipeline is started with technical data collection and supply-demand analyzing, continued with data analysis, rute construction and result of condition operation. The standard design of this design is DnV 2000. Gas demand in Power Plant Muara Tawar is 400 MMSCFD. From secondary data had been obtained total length of alternative route 3,7 km. Carbon Steel pipe diemeter which had been used 22 inch nominal diameter. Gas supply pressure is 350 psig with pressure of demand point is setted on 500 psig. On pipeline system design the preesure before put in to compressor is around 321,7 psig. The design on bottom stability factor is the main concern. From the design calculation the minimum pipe weight is 26,61 ton, whereas the design around 932,6 ton. So that pipe will be stabil on bottom of sea.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)