Penjadwalan Produksi untuk Meminimalisasi Makespan dan Tardiness dengan Menggunakan Metode Ant Colony (Studi Kasus: PT MORITA TJOKRO GEARINDO)
Bibliografi
Author:
MARCHELINA, DEVINA
;
Hutahaean, Hotma Antoni
(Advisor)
Topik:
Penjadwalan
;
Metode NEH
;
Tardiness
;
Ant Colony
;
Scheduling
;
Method of NEH
Bahasa:
(ID )
Penerbit:
Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya
Tempat Terbit:
Jakarta
Tahun Terbit:
2012
Jenis:
Theses - Undergraduate Thesis
Fulltext:
Devina Marchelina's Undergraduate Theses.pdf
(2.52MB;
44 download
)
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
FTI-853
Non-tandon:
tidak ada
Tandon:
1
Lihat Detail Induk
Abstract
PT. Morita Tjokro Gearindo a manufacturing company that produces gear. The production system is applied to the PT. Morita Tjokro Gearindo the flexible flow shop. Gear as a whole through the same process, but not all the gear through all of these existing processes. This problem is happening now is a delay. Setingkali production targets are not met. Production process during the Month in July 2010 began to experience delays in production so that products manufactured exceed the due date specified by the consumer. This happens because the production scheduling system that is not currently implemented using a structured system daan with a method, but only based on an estimate only. Problems that happen of course is not very good if you do not do repairs. Then made a proposed production scheduling using Ant Colony with a view to minimizing the lateness and tardiness. It is also used as a method NEH method used to find solutions early in production scheduling proposals are made. Production scheduling is assisted with the establishment of the proposed program to solve production scheduling application using the NEH as the determination of the initial solution and Ant Colony method to obtain the best job sequence with the tardiness and makespan are minimum values. The application program is designed to program with Visual Studio 2008 C # programming language. This application program can help the calculation so that the calculation can be done in a short time and with a small error rate. Of calculations have been carried out, obtained the order Task 1 - 23 - 17-26 - 24 - 25-14 - 5 - 2-16 - 9 - 19-15 - 6 - 7-8 - 11 - 4-3 - 12 - 13 - 10-1 - 20 - 21-22 minutes with a value of 49027.43 makespan, tardiness value of 0, which means the job is done before the due date specified.