Anda belum login :: 01 Jun 2025 11:27 WIB
Detail
BukuAnalisa Kelayakan Proyek Pendirian Perakitan Baterai Ponsel ( Studi Kasus PT. LIMA SAHABAT )
Bibliografi
Author: RINI ; Wahyu, Marsellinus Bachtiar (Advisor)
Topik: Feasibility Studies; Sensitivity Analysis; Plant Establishment
Bahasa: (ID )    
Penerbit: Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2011    
Jenis: Theses - Undergraduate Thesis
Fulltext: Rini's Undergraduate Theses.pdf (3.78MB; 43 download)
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTI-700
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
PT. Lima Sahabat is a trading company engaged in the assembly of cell phone batteries. Along with the era of globalization and developments in the communication technology industry and retail is growing quite rapidly at this time, total demand for mobile phone battery also increases. Total demand for cell phone batteries is increasing significantly in each year, starting from 2008 until 2010. But the cost of batteries overvalued, it is that drives the PT. Lima Sahabat to establish an assembly plant. In carrying out a project such as project development firm in the generally require substantial funds and affect the company within a certain timeframe. Therefore needs to be done feasibility study carefully in order not happen ketidaklanjuran investment that is too large, but the project was not profitable. The methods used by the authors to analyze the feasibility of developing the company consists of aspects of marketing, technical aspects, legal aspects, management, and financial aspects. The first thing to do is to analyze aspects of the market. In analyzing the aspects of this market is based on forecasting results, the authors use a method of forecasting Double Moving Average (m = 5) and find that the total demand for the first year amounted to 88,523 units. Further analysis is about the technical aspects and legal & management aspects. Based on the technical aspects of making this amount of labor required are as many as 20 people including administrative staff and management. But along with increased capacity that will be performed by company employees and other resources such as machinery will increase every year. Based on the results of financial analysis, the magnitude of the investment costs required for project development company PT. Lima Sahabat of Rp.7.984.890.896 .- This is the first year. During 6 years of operations of PT. Lima Sahabat targeted to be able to reach NPV Rp. 2.792.722.347 .-, 16,54% IRR and payback period for 5 years 3 months 26 days. To support the financial aspects of the analysis, sensitivity analysis is conducted to help determine what variables can affect the results of a feasibility study of this project. Based on the results of sensitivity analysis found that the inflation rate of 10% and the interest rate of 10% is what will make this company the development projects will not be feasible.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.109375 second(s)