Anda belum login :: 17 Apr 2025 11:46 WIB
Detail
BukuIntegrasi Penjadwalan Produksi dan Penjadwalan Maintenance (Studi Kasus: PT. NUSAHADI CITRAHARMONIS)
Bibliografi
Author: SUTOTO, FELIX EDDY ; Hidayat, Trifenaus Prabu (Advisor)
Topik: Preventive maintenance; Production scheduling; Combining inspection time and replacement time
Bahasa: (ID )    
Penerbit: Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2010    
Jenis: Theses - Undergraduate Thesis
Fulltext: Felix Eddy Sutoto's Undergraduate Theses.pdf (1.64MB; 68 download)
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTI-662
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
PT. Nusahadi Citraharmonis is one of the automotive manufacturing company. The crucial problem that PT. Nusahadi Citraharmonis facing is the machine breakdown that occured during the production process, so that delay the production process. The delayed of production process will result in failure to achieve production targets. Based on the collected data, stamping machines have the biggest downtime. Maintenance activity that carried out by PT. Nusahadi Citraharmonis is corrective maintenance even though there are preventive maintenance treatments, but the action is just a cleaning and lubrication and only carried out during the holidays.
Based on the collected data, a suggestion to improve the maintenance system can be given to the company by using preventive maintenance which consist of inspection and replacement of machine components. The adjacent replacement and inspection time can be combined when making a maintenance schedule. The time required for maintenance is the time for production so it is
necessary to reschedule. Therefore, it is required the integrated production scheduling and maintenance scheduling.
The focus of this research is the optimization of integrated production scheduling and maintenance by minimizing makespan. Results comparison of
integrated production scheduling and maintenance scheduling and integrated production scheduling and maintenance by combining the adjacent replacement time and inspection time, there is a difference of 0.599% in January 2010, 0.038%
in May 2010 and 0.221% in June 2010.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.109375 second(s)