ArtikelModelling Concurrent Engineering Projects Under Uncertainty  
Oleh: [s.n]
Jenis: Article from Journal - ilmiah internasional
Dalam koleksi: Concurrent Engineering vol. 7 no. 3 (Sep. 1999), page 269-274.
Topik: concurrent engineering; product development; project management; uncertainty; manufacturing; simulation.
Fulltext: 269.pdf (554.04KB)
Isi artikelConcurrent Engineering (CE) is known for its ability to reduce product development time and cost, while it increases quality. CE achieves this by overlapping the activities and executing them in parallel. This requires careful planning and organisation prior to implementing CE projects, otherwise it may cause delays in project completion and deterioration in project performance due to uncertainties in the process. In this paper, a probabilistic mathematical model fitted to the precedence relations is proposed to estimate the project completion time under uncertainty while simulating the randomness in the process.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)