Anda belum login :: 29 Apr 2025 21:26 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Modelling Concurrent Engineering Projects Under Uncertainty
Oleh:
[s.n]
Jenis:
Article from Journal - ilmiah internasional
Dalam koleksi:
Concurrent Engineering vol. 7 no. 3 (Sep. 1999)
,
page 269-274.
Topik:
concurrent engineering
;
product development
;
project management
;
uncertainty
;
manufacturing
;
simulation.
Fulltext:
269.pdf
(554.04KB)
Isi artikel
Concurrent Engineering (CE) is known for its ability to reduce product development time and cost, while it increases quality. CE achieves this by overlapping the activities and executing them in parallel. This requires careful planning and organisation prior to implementing CE projects, otherwise it may cause delays in project completion and deterioration in project performance due to uncertainties in the process. In this paper, a probabilistic mathematical model fitted to the precedence relations is proposed to estimate the project completion time under uncertainty while simulating the randomness in the process.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)