Anda belum login :: 11 Jun 2025 08:44 WIB
Detail
BukuUsulan Perbaikan Sistem Persediaan Komponen Lokal Pada G-Line (Studi Kasus : PT Suzuki Indomobil Motor Tambun II, Bekasi)
Bibliografi
Author: IRANIKA, CHEFIRA ; Hidayat, Trifenaus Prabu (Advisor)
Topik: Q Inventory System; Stopline; Stockout
Bahasa: (ID )    
Penerbit: Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2010    
Jenis: Theses - Undergraduate Thesis
Fulltext:
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTI-564
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
The inventory management, good raw materials is one of the success factors of a manufacturing company to serve the needs of manufacturers and consumers in producing a quality product and on time. PT. Indomobil Suzuki Motor II TB is one of the automotive industry, problems faced was the delay in supply of parts and components to the unavailability of G-line. To meet the demand on time, companies need a system that can help companies to plan all their material needs, the system can be used is the method of continuous review system (model Q) is modified at a cost of stockout costs stopline. Based on calculations, for the Stiffener, Block & T/M Case L component obtained optimal amount (Q) for 1267 units with a total cost of inventories Rp 2.960.049,21 during January to October 2009.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.0625 second(s)