Anda belum login :: 05 Jun 2025 06:55 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
comparison between mixed integer programming with heuristic method for job shop scheduling with separable sequence-dependent setups
Oleh:
Widyadana, I Gede Agus
Jenis:
Article from Journal - ilmiah nasional - terakreditasi DIKTI - non-atma jaya
Dalam koleksi:
Jurnal Teknik Industri vol. 3 no. 1 (Jun. 2001)
,
page 9-17.
Topik:
job shop
;
sequence dependent setup
;
Mixed Integer Programming
;
heuristic.
Fulltext:
9.pdf
(48.79KB)
Isi artikel
The decisions to choose appropriate tools for solving industrial problems are not just tools that achieve optimal solution only but it should consider computation time too. One of industrial problems that still difficult to achieve both criteria is scheduling problem. This paper discuss comparison between mixed integer programming which result optimal solution and heuristic method to solve job shop scheduling problem with separable sequence-dependent setup. The problems are generated and the result shows that the heuristic methods still cannot satisfy optimal solution.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0 second(s)