Anda belum login :: 19 Apr 2025 17:00 WIB
Detail
ArtikelAnalisis Perbandingan Pengendalian Persediaan Bahan Baku dengan Pendekatan Model EOQ dan JIT/EOQ  
Oleh: Hidayanto, Taufik
Jenis: Article from Journal - ilmiah nasional
Dalam koleksi: Jurnal Teknologi Industri vol. 11 no. 4 (Oct. 2007), page 315-322.
Topik: EOQ; EOQ/JIT
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: JJ83
    • Non-tandon: 1 (dapat dipinjam: 0)
    • Tandon: tidak ada
    Lihat Detail Induk
Isi artikelPlaning and control raw material in company is purpose to depress the expense, so that in the end will imrove the company profitability. PD. TaruMartani is company which is active in production of non migas of chroot and tobacco shag. Problems faced by PD. Tarumartani how to determine the optimal amount and time of ordering of raw material of Kentucky Van Nelle product so that can minimize the raw material inventory expense. Way of decision determination to be taken fixed use the company wisdom or by using method which deal with raw material inventory in the plan and operation in company so that planning and control of raw material inventory of tobacco of Kentucky of product of Van Nelle expected can be reached better and efficient Method used in research with the approach model the JIT/EOQ. To determine of requirement of the raw material, used forecasting for one year, where the requirement per year 71.414 unit during 12 period (month). Pursuant to research amount of ordering of raw material of tobacco of Kentucky Van Nelle product shall be as follows to sum up the ordering with the model JIT/EOQ equal to 5512 unit with the total cost of supply Rp 30 Billion and number delivery 5. But in model JIT/EOQ there are optimal ordering amounth that is pursuant to supply capacities 1000 equal to 6038 unit with the total cost supply equal to Rp 28 Bilion
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)