Anda belum login :: 23 Jul 2025 21:25 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Twice the Work, Half the Time
Oleh:
Trebilcock, Bob
Jenis:
Article from Bulletin/Magazine - ilmiah internasional
Dalam koleksi:
Modern Materials Handling vol. 62 no. 13 (Dec. 2007)
,
page 26-30.
Topik:
Operation
;
Manufacture
;
Compressors
;
pump
;
blower
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
MM71.5
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
Keeping track of 13.000 SKU (Stock Keeping Units) is no small matter for any manufacturer that aims to keep the production lines running without a hiccup; Combina that challenge with a full-scale aftermarket fulfillment operation that has an additional 80.000 active SKU, and you understand the challenge faced by Garner Denver, a leading worldwide manufacturer of compressros, pumps and blowers for industrial and transportation applications.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)