ArtikelAnalisis Kinerja Biaya Konstruksi. Studi Kasus: Rumah Tempat Tinggal  
Oleh: Mardiaman
Jenis: Article from Journal - ilmiah nasional
Dalam koleksi: Jurnal Ilmiah Darma Persada vol. 04 no. 02 (Mar. 2006), page 42.
Topik: Cost; Variants; Performance Index; Project Construction; Productivity
Ketersediaan
  • Perpustakaan PKPM
    • Nomor Panggil: J78
    • Non-tandon: 1 (dapat dipinjam: 0)
    • Tandon: tidak ada
    Lihat Detail Induk
Isi artikelThe success and failure of the projects constructions are influenced by cost and schedule variance, performance index as well. To avoid over-run cost, delayed schedule and low performance index, the construction needs to be controlled very early. This paper is to find out the cost variance and productivity index of construction. Data obtained from accounting department project. The result of the study showed that productivity index is different both to the first construction project and to the second project that have the same performance index relatively.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)