Anda belum login :: 23 Nov 2024 18:48 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Constraint-Oriented Cooperative Scheduling for Aircraft Manufacturing
Oleh:
Esquirol, P.
;
Lopez, P.
;
Haudot, L.
;
Sicard, M.
Jenis:
Article from Bulletin/Magazine
Dalam koleksi:
IEEE Intelligent Systems vol. 12 no. 1 (1997)
,
page 32-39.
Topik:
aircraft noise
;
constraint - oriented
;
cooperative
;
scheduling
;
aircraft manufacturing
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
II60.2
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
The flanged element manufacturing workshop at Dassault Aviation's plant in Argenteuil, France, uses a number of short-run manufacturing cycles to produce small quantities of numerous aircraft structural parts. The many manual finishing operations, components, and manufacturing processes involved place a premium on management flexibility and quick reactions for meeting ever - changing production demands. Human operators, therefore, must assume a pivotal role in the workshop's decision making processes. This case study reports on our efforts to converge a top - down approach to functional design and a bottom - up approach to cognitive design of human - computer interactions to increase efficiency at the workshop. The functional design effort relies on a constraint reasoning process to provide a set of decision - making solutions, while the cognitive design effort comprises a knowledge acquisition phase. We combined these concepts to produce a highly interactive mock - up system, programmed with a constraint logic programming language, that lets users easily modify previous choices.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)