Alokasi Resiko dari Metode Pengadaan Bangunan
Oleh:
Pranata, Jan Agustina
Jenis:
Article from Journal - ilmiah nasional - tidak terakreditasi DIKTI
Dalam koleksi:
Widya: Majalah Ilmiah vol. 20 no. 217 (Oct. 2003)
,
page 55.
Topik:
metode pengadaan bangunan
;
alokasi resiko
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
MM47.20
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
Construction contract plays an important role in contraction project process because no work can be done before the agreement between owner and contarctor is reached with all sides understanding every risk in the contract. Risk can be reduced by allocating it to the parties that have higher ability in evaluation, controlling, and handling risk.