Anda belum login :: 23 Nov 2024 04:40 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Perencanaan Produksi Berhiararki Produk Olahan Kayu Menggunakan Model Goal Programming
Oleh:
Uslianti, Silvia
;
Angggoro, Paulus Wisnu
Jenis:
Article from Journal - ilmiah nasional
Dalam koleksi:
Jurnal Teknologi Industri vol. 9 no. 2 (Apr. 2005)
,
page 109-120.
Topik:
Aggregate Production Planning
;
Goal Programming
;
Lot Sizing
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
JJ83.6
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
Production planning is a very important activity for a manufacturing company. For a company producing a variety of product the production planning will be complicated. In this case it's necessary that the company to make an aggregate production planning. There are many goals to achieve in production activities. Where the goal sometime different from each other. On such condition company needs to make a production planning decision that can accomodate all of the goals. Goal Programming Model can be used for aggregate production planning. This multi objective model can accomodate more than one goal which will be achieved by the company. Product demand forecasting is input for aggregate production planning. From this aggregate production, furthermore, disaggregation must be conducted, then it must be continued by raw material planning. The raw material planning is made in economical lot size each order. The Goal Programming model has been applied at PT. Arga Tirta Lestari Pontianak in goals to maximize profit, minimize subcontract product amount, minimize overtime labour cost and minimize inventory amount. The result shows that the Goal Programming model could accomodate three goals that will be achieved by the company, except that goal to minimize inventory amount. The solution provided by the Goal Programming model could reduce the minimize overtime labour cost of the realization by as much as 64%. Least Unit Cost (LUC) and Wagner-Whitin Algorithm (WW) methods give the minimum total cost for logs raw material planning.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)