Anda belum login :: 17 Feb 2025 08:13 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Application of Kaizen principles for the optimization of duration of overhaul of boiler and turbine units of 500 MW thermal units at Simhadri thermal power project
Oleh:
V.S.Appaji
;
R.Samuel
Jenis:
Article from Proceeding
Dalam koleksi:
ANQ Congress 19-22 October 2010 New Delhi
,
page 1-11.
Topik:
Gemba
;
Muda
;
Muri
;
Business Excellence
;
Overhaul
;
Boiler
;
Turbine
Fulltext:
VS_Appaj_NTPC_Application_of_Kaizen.pdf
(80.52KB)
Isi artikel
Kaizen principles, particularly the idea of elimination of MUDA (Waste) can be very effectively used in Unit Overhauls of a power plant optimizing overhaul time without loosing the quality. The kaizen team of NTPC-Simhadri has implemented this practice in Boiler and LP turbine overhauls. The methodology adopted was brainstorming the entire set of activities during a Gemba Kaizen Workshop with active participation of all the teams carrying out the works. A number of recommendations of the workshop have been implemented in the overhauls. The overhauls were completed with significant improvement in time while also identifying further scope in reduction of time.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)