Anda belum login :: 23 Nov 2024 05:37 WIB
Detail
ArtikelAnalisa pressure build up test pada sumur x lapangan y dengan metode horner manual dan ecrin 4.10  
Oleh: Yulianto, Agus Andri ; Sulistyanto, Djoko ; Larope, Albert
Jenis: Article from Proceeding
Dalam koleksi: Prosiding Seminar Nasional Cendekiawan diadakan di Universitas Trisakti, Jakarta, 1 Oktober 2015 : Buku 1, page 86-97.
Fulltext: 203477 - Buku 1 - p 86-97.pdf (318.47KB)
Isi artikelThe main purpose of a hydrocarbons well testing or pressure transient analysis is to decide the ability of a layer or formation to produce. Pressure transient analysis is basically giving a pressure balance disorder on well tested. In this final thesis is conducted analysis of well test results at Pressure Build Up with method Type Curve Pressure Deritative with help of software Ecrin v4.10 and Horner Plot analysis manually.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)