Anda belum login :: 23 Nov 2024 04:22 WIB
Detail
ArtikelImplementation of Poka Yoke on administration of the Palm Oil Mill  
Oleh: Hudori, M
Jenis: Article from Proceeding
Dalam koleksi: PROCEEDING The 8th International Seminar on Industrial Engineering and Management (8th ISIEM). Atria Hotel & Conference, Malang, Indonesia March 17 – 19, 2015, page QM-21.
Topik: Poka Yoke; Palm Oil Mill; Quality Control
Fulltext: Paper 41 M Hudori - Citra Widya Edukasi Polytechnic of Palm Oil.pdf (264.62KB)
Isi artikelThe process of measurement until calculation result of sounding stock CPO and PK take up to 2 hours (7:00 to 9:00 pm). Especially calculation result takes up 1 hour. While HO provide maximum reporting limit at 9:30 pm. Counting process which is going on for too long because it is done manually. In addition, an error in the calculation is often the case. As a result, PDR often times have to be revised after it was reported, so assessment to performance of the POM administration is the worse. Poka Yoke is needed to facilitate the work and anticipate the occurrence of error, one of them as a tool to calculate the result of sounding stock in POM which initially takes 1 hour to 5 minutes with no error, so PDR can be delivered more quickly than before it.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)