Anda belum login :: 23 Nov 2024 04:54 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Lean manufacturing approach with particle swarm optimization-line balancing
Oleh:
Maulidya, Rahmi
;
Moengin, Parwadi
;
Andama, Nisa
Jenis:
Article from Proceeding
Dalam koleksi:
PROCEEDING The 8th International Seminar on Industrial Engineering and Management (8th ISIEM). Atria Hotel & Conference, Malang, Indonesia March 17 – 19, 2015
,
page PS-94.
Topik:
lean manufacturing
;
line balancing
;
particle swarm optimization
;
flow process map
;
outsourcing
Fulltext:
Paper 102 Rahmi Maulidya - Trisakti University.pdf
(578.78KB)
Isi artikel
Manufacturing lead time must be evaluated when production can’t meet the target. In lean manufacturing, waste in production line is prohibited and it must be eliminated so it can shorten the length of production time. This research is to identify and to reduce the waste in order to achieve the target of production. Waste identification used value stream mapping and process activity mapping. In order to achieve the target, lean manufacturing approach is conducted by balancing the line using Particle Swarm Optimization (PSO), evaluating work system using process flow chart and outsourcing the process.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)