Anda belum login :: 26 Nov 2024 18:03 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Pelaksanaan Pembangunan Jalan Cisalatri Bandung
Oleh:
Susilo, Budi Hartanto
;
Imanuel, Ivan
Jenis:
Article from Journal - ilmiah nasional - tidak terakreditasi DIKTI - non-atma jaya
Dalam koleksi:
ZENIT vol. 03 no. 03 (Dec. 2014)
,
page 229-238.
Topik:
construction
;
access road
;
Gedebage
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
ZZ1
Non-tandon:
tidak ada
Tandon:
1
Lihat Detail Induk
Isi artikel
Transportation infrastructure is available in Indonesia, yet it is not sufficient to meet the increasing demand. Construction of new infrastructure is needed to support the transportation system. The construction of Cisalatri Road and Bridge project is a construction of a new access road to Gelora Bandung Lautan Api Stadium from Rancanumpang Highway. The type of the constructed road pavement is a rigid pavement. The work includes excavation (using equipment), pile foundation, limestone embankment, geotextile, soil embankment, base course, lean concrete, and concrete pavement work. Based on the resut of fatigue and erotion analysis, the concrete pavement thickness with an excess thickness of about 4 cm eligible. The project has some delays due to change of workplan, large amount of rain, limited materials and human resources, as well as the availability of heavy equipment.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)