ArtikelA Dynamic Approach for Evaluating Earthwork Hauls in Construction  
Oleh: Burdett, Robert ; Kozan, Erhan
Jenis: Article from Proceeding
Dalam koleksi: The 14th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS), 3-6 December 2013 Cebu, Philippines, page 1-11.
Topik: earthworks; graph Algorithms; dynamic objective; shortest path
Fulltext: 1127.pdf (4.81MB)
Isi artikelA graph theoretic approach is developed for accurately computing haulage costs in earthwork projects. This is vital as haulage is a predominant factor in the real cost of earthworks. A variety of metrics can be used in our approach, but a fuel consumption proxy is recommended. This approach is novel as it considers the constantly changing terrain that results from cutting and filling activities and replaces inaccurate “static” calculations that have been used previously. The approach is also capable of efficiently correcting the violation of top down cutting and bottom up filling conditions that can be found in existing earthwork assignments and sequences. This approach assumes that the project site is partitioned into uniform blocks. A directed graph is then utilised to describe the terrain surface. This digraph is altered after each cut and fill, in order to reflect the true state of the terrain. A shortest path algorithm is successively applied to calculate the cost of each haul and these costs are summed to provide a total cost of haulage
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)