Anda belum login :: 26 Nov 2024 10:08 WIB
Detail
Artikel Quality Improvement Effort Using Triz Method Case Study In Cv ‘X’, A Metalcasting Industry  
Oleh: Wirawan, Christina ; Desiana, Maria Sari
Jenis: Article from Proceeding
Dalam koleksi: Proceeding The 7th International Seminar on Industrial Engineering and Management (7th ISIEM) di Bali, March 11th – 13th, 2014, page QM 1-6.
Topik: Defective; Fault Tree Analysis; TRIZ
Fulltext: Paper 05 Christina Wirawan Maranatha University.pdf (282.38KB)
Isi artikelCV ‘X’ is a metalcasting company located in Klaten, Central Java. The problem CV ‘X’ faced is high percentage of defective brake block metallic product about 8%, higher than expectation about 3%. To reduce defectives, defect cause must identified and then eliminated. From fault tree analysis, it’s found that there are some cause of defect that are contradicting. Fix one cause can make other cause worse. So it’s difficult to reduce or eliminated the cause dramatically, because there are other cause increasing. In this research, TRIZ method used to solve the contradiction, so as both cause that are contradicted can reduced or eliminated
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)