ArtikelIntegrated System Design For Order Release At Machining Department PT. ABC  
Oleh: Suryadhini, Pratya Poeri ; Damayanti, Dida Diah ; Juliani, Widia
Jenis: Article from Proceeding
Dalam koleksi: Proceeding The 7th International Seminar on Industrial Engineering and Management (7th ISIEM) di Bali, March 11th – 13th, 2014, page DSS 30-34.
Topik: Order release; sequence method; Andon
Fulltext: Paper 25 Pratya Poeri Suryadhini Telkom University.pdf (237.0KB)
Isi artikelManufacturing companies in Indonesia must be prepared in order to meet customer satisfaction. At PT. ABC, one of the manufacturing company in Bandung, before run the production process the completeness of equipment must be ready. However the real conditions not all need can be met because checks need be performed manually. It triggers the delay due date. The other problem is the sequence of job causingthe lateness, and there is no information of order status. Based on that problem need a system that could integrate for checking processess needs using integrated data system to ensure the readiness of order release, sequence the job using Kusiak Algorithm and job status by using RFID technology and Andon system. By implement the system, the problem causing job lateness can be reduce
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)