In logistic management, planning, accepting, warehousing, distributing, and transporting are required. When the warehouse is not optimum, in addition will only swell the cost of expenditure, also can hinder the distribution process. Therefore, warehouse optimization is seen as something that is very necessary, in addition to the development of the distribution model is also needed to minimize the time of distribution from BNPB warehouse to disaster victims. Determination of warehouse location itself is done by using center of gravity method where best result obtained from using this method are in Palangkaraya area with minimum value of Rp 1,133,371,000.00. While the development of the model will use the help of ProModel software where ProModel is one of the excellent tools to be used in determining alternative design tests before being implemented, based on the proposals given that the proposal is applicable, and also able to minimize the time distribution of disaster relief items. |