Anda belum login :: 24 Nov 2024 02:23 WIB
Detail
BukuUsulan Penjadwalan Produksi Menggunakan Metode Algoritma Johnson Dan Algoritma Enumerasi (Studi Kasus: PT. Morita Tjokro Gearindo)
Bibliografi
Author: JOVIAN, THEODORUS ; Hidayat, Trifenaus Prabu (Advisor)
Topik: Scheduling; Johnson Algorithm; Enumeration Algorithm; Flow Time
Bahasa: (ID )    
Penerbit: Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2017    
Jenis: Theses - Undergraduate Thesis
Fulltext: Theodorus Jovian's 1 Undergraduate Theses.pdf (4.34MB; 9 download)
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTI-1344
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
Scheduling is the main basis in the world of manufacturing. Scheduling has the objective to regulate the allocation of company resources so that productivity can be increased. PT. Morita Tjokro Gearindo (PT. MTG) is a manufacturing company that produces gear. PT MTG does not have scheduling method that can reduce the delay in delivery orders. The Delays in delivery orders cause the company suffered financial losses. PT MTG need to make changes in production scheduling method to reduce delays in delivery orders and reduce the risk of financial losses. This research attempts to provide 2 recommendations to improve the production scheduling problems. The recommendations of scheduling method are Johnson algorithm method and Enumeration algorithm method. This research purpose to analyze the current scheduling system, analyzing the comparison results from the two methods of scheduling and provide the best scheduling results based on the criteria of minimizing flowtime. The Job Scheduling software in WinQsb assist in data processing so that the calculations can be done in a short time with a small error rate. This research using a purchasing orders in period of February 2016 for 20 types of gear products which are divided into 3 production line. The results of data processing in this research is the chosen of the Enumeration Algorithm as the best method with the job sequence in Line 1 for due date February 2, 2016 is J - H - A - I - F with the flowtime 109.834 seconds and the job sequences for the due date February 16, 2016 is G - B - C - E - D with the flowtime 97.904 seconds. The Job sequences in Line 5 is L - N - O - K - M with the flowtime 133.157 seconds. And the Job sequences in Line 8 is S - Q - P - T - R with the flowtime 104.816 seconds.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.171875 second(s)