Anda belum login :: 23 Nov 2024 13:59 WIB
Detail
BukuPerancangan Tata Letak Pabrik Berdasarkan Rencana Ekspansi Pabrik Dengan Algoritma: Blocplan Dan Craft (Studi Kasus: PT. Hidayat Putra Industri)
Bibliografi
Author: ERIKA, MARIA ALLYSSA ; Hutahaean, Hotma Antoni (Advisor)
Topik: Facility Layout; Systematic Layout Planning; BLOCPLAN; CRAFT; CORELAP
Bahasa: (ID )    
Penerbit: Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2017    
Jenis: Theses - Undergraduate Thesis
Fulltext: Maria Allyssa Erika's Undergraduate Theses.pdf (8.33MB; 57 download)
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTI-1312
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
PT. Hidayat Putra Industri is a developing medium-scale plastic bottle manufacturing company. Its production demand increases along with the growth of the company. Due to this, PT. Hidayat Putra Industri plans to increase its machinery to accomplish its future production demand. Warehouse area have been unable to accommodate all the raw materials, auxiliary materials, and finished goods, this causes the majority of finished goods is placed in the production area so that the current layout has only amounted to 1 sampai 1,2 m wide aisle. The restriction of traffic lanes and allowances caused disruption of material transport activity and work comfort. As for the action taken by company is expanding its area in order to accommodate more facilities and services. Current size of the company is 1.008 m2 which have already made it impossible to increase its facilities. However, the size of area available for the company’s expansion is around 5.856 m2. The new facility layout plan for expansion is using SLP (Systematic Layout Planning) to yield a better overall company’s layout. The design project of the production area’s layout is also using hybrid alogrithm BLOCPLAN and improvement alogrithm CRAFT. Criteria for the selection of several alternative layouts based on minimum material-movement distance, lowest total material transportation cost, shortest transfer time, and has a convenient area coverage (spaciousness). As for the design of the overall plant layout using CORELAP method for generates layout with arrangement relations department by its association with total area of the factory has been in accordance with the available land area. Based on the calculation, the layout design based on BLOCPLAN is the best design as it yields the shortest transfer distance of 539,55 m, the smallest total transfer cost of Rp 129.326,65 per day and the fastest total transfer time of 500,23 minutes per day, and the total area coverage which can be cut for 110,05 m2. In the design of the overall plant layout, the total area required to support plant expansion plans include additional facilities are in accordance with the amount of land available.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.171875 second(s)