Anda belum login :: 24 Nov 2024 13:22 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Usulan Perbaikan Untuk Penyeimbangan Lini Perakitan Rear Axle Assy (Studi Kasus : PT. Inti Ganda Perdana)
Bibliografi
Author:
PUSPITA, RENA
;
Hutahaean, Hotma Antoni
(Advisor)
Topik:
Agile
;
Time
;
Balancing
;
Demand
Bahasa:
(ID )
Penerbit:
Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya
Tempat Terbit:
Jakarta
Tahun Terbit:
2016
Jenis:
Theses - Undergraduate Thesis
Fulltext:
Rena Puspita's Undergraduate Theses.pdf
(3.33MB;
7 download
)
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
FTI-1296
Non-tandon:
tidak ada
Tandon:
1
Lihat Detail Induk
Abstract
PT. Inti Ganda Perdana which is a company engaged in the production of automobile spare parts, which one of them is the rear axle. The company has two different assembly lines are lines A and B. Problems faced by companies is the customer demand exceeds the capacity of which is owned by the company. This is due to the increasing demand for the product on certain models due to the emergence of a new product. Cycle time to create a single axle unit is 859 seconds with lead-time for 1 day. This study aims to correct the problem by using the company's approach to agile manufacturing system. At this stage of delivery, improvements were made to the company's production system to rebalance demand to be able to move one product model to another assembly line for the company to meet customer demand. Based on the proposal, the average product that can be moved to the line A is equal to 4051. And the average number of requests that can’t be fulfilled amounted to 7018 units
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Lihat Sejarah Pengadaan
Konversi Metadata
Kembali
Process time: 0.171875 second(s)