Anda belum login :: 27 Nov 2024 07:17 WIB
Detail
BukuAnalisis Pengukuran Kinerja Dengan Metode Supply Chain Operation References (Studi Kasus: Bagian Produksi PT. Hasil Raya Industries, Karawang)
Bibliografi
Author: LIDIA ; Rumanti, Augustina Asih (Advisor)
Topik: Performance Measurement; Supply Chain Activities; SCOR Method
Bahasa: (ID )    
Penerbit: Program Studi Teknik Industri Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2011    
Jenis: Theses - Undergraduate Thesis
Fulltext: Lidia's 1 Undergraduate Theses.pdf (5.01MB; 73 download)
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTI-783
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
PT. Hasil Raya Industries is a company manufactur in the plastic industry, their products are bottles and plastic lid, such as drink bottles, detergent bottles, cosmetic bottles and other bottles. PT. Hasil Raya Industries produced by using injection and molding machines. Bottles and plastic lid are made using raw materials and supporting materials from suppliers and then their made the production into finished goods. Supply chain performance measurement system in the company has no definite standard so that research was conducted to analyze, identify a performance measurement system, and measure the performance of supply chain management of production. Supply chain management to be effective and efficient, it is needed mapping of a whole activity to company supply chain. Mapping activity supply chain has been done by production that uses Supply Chain Operations Reference (SCOR) method and this mapping was done from level 1 to level 3. SCOR method brought into relief scope of company activity from upstream to downstream. SCOR method have five element such us plan, source, make, deliver, return and each element has different KPIs. Based on identification KPIs have 15 KPIs can measured
performance in the production.The results showed that the rate of return correlation planning exogenous constructs on endogenous constructs plan and construct level correlation exogenous scheduling shipments from suppliers to construct an endogenous source have enough, while the other exogenous constructs have strongly.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.1875 second(s)