Anda belum login :: 27 Nov 2024 04:43 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Nasreya: a treatment and disposal facility for industrial hazardous waste in Alexandria, Egypt: phase I
Oleh:
[s.n]
Jenis:
Article from Journal - ilmiah internasional
Dalam koleksi:
Waste Management & Research vol. 23 no. 2 (Apr. 2005)
,
page 167-170.
Topik:
Hazardous waste
;
landfill
;
solar evaporation
;
Egypt
;
wmr 792–8
Fulltext:
167.pdf
(89.14KB)
Isi artikel
A facility for the treatment and disposal of industrial hazardous waste has been established in Alexandria, Egypt. Phase I of the facility encompassing a secure landfill and solar evaporation ponds is ready to receive waste, and Phase II encompassing physico-chemical treatment, solidification, and interim storage is underway. The facility, the Nasreya Centre, is the first of its kind in Egypt, and represents the nucleus for the integration, improvement and further expansion of different hazardous waste management practices and services in Alexandria. It has been developed within the overall legal framework of the Egyptian Law for the Environment, and is expected to improve prospects for enforcement of the regulatory requirements specified in this law. It has been developed with the overall aim of promoting the establishment of an integrated industrial hazardous waste management system in Alexandria, serving as a demonstration to be replicated elsewhere in Egypt. For Phase I, the Centre only accepts inorganic industrial wastes. In this respect, a waste acceptance policy has been developed, which is expected to be reviewed during Phase II, with an expansion of the waste types accepted.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)