Anda belum login :: 27 Nov 2024 05:48 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Determining The Value Of Sequential And Concurrent NPD Processes
Oleh:
[s.n]
Jenis:
Article from Journal - ilmiah internasional
Dalam koleksi:
Concurrent Engineering vol. 16 no. 3 (Sep. 2007)
,
page 201-212.
Topik:
expected payoff
;
concurrent engineering
;
new product development.
Fulltext:
201.pdf
(307.59KB)
Isi artikel
The value of using sequential (SE) and concurrent engineering (CE) processes for new product development (NPD) is quantitatively determined by means of the maximum expected payoff method. This method models a process into a sequence of intervals and calculates the value of the maximum benefit as a result of optimum decisions during each interval. SE and CE processes are evaluated in terms of the parameters: simultaneity and intensity of interaction. The maximum expected payoff method shows under what conditions SE or CE is best, and the effect of incomplete information and resultant rework. Results are compared to actual NPD processes with good agreement.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)