Anda belum login :: 24 Nov 2024 15:43 WIB
Detail
BukuPengaruh Alat Penukar Kalor Selongsong Panas dan Pipa Dingin Menggunakan R-22 dan MC-22 pada AC Split
Bibliografi
Author: SAPUTRA, HARI ; Gunawan, Harjadi (Advisor)
Topik: Energi; Kompresi Uap; Heat Exchanger
Bahasa: (ID )    
Penerbit: Program Studi Teknik Mesin Fakultas Teknik Unika Atma Jaya     Tempat Terbit: Jakarta    Tahun Terbit: 2009    
Jenis: Theses - Undergraduate Thesis
Fulltext: Hari Saputra Martan's Undergraduated Theses.pdf (851.5KB; 18 download)
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: FTM-1854
    • Non-tandon: tidak ada
    • Tandon: 1
 Lihat Detail Induk
Abstract
Technological advancement has increased the usage of air conditioning; while it has been known also that machines that use principle of thermodynamics require high amount of energy. On the other hand, energy has been increasingly important and valuable these days. Thus, there is a need to use them efficiently. Bearing this in mind, the main purpose of this thesis is to observe and analyze implemented methods in steam compression cycle. This system includes several components that intertwined with each other, such as evaporator, compressor, condenser and expansion valve. The writer suggests addition of a component which boosts exchange of heat in the system (heat exchanger). On top of that, the writer also suggests substitution from synthetic refrigerant (R-22) to hydrocarbon refrigerant (MC-22). This test used “one shell pass & two tube pass” type heat exchanger using cold stream in the tube and hot stream in the shell. Test results show reduced electricity consumption and improved refrigeration effect. Further test results processing also shows an improvement in result coefficient. Analysis on the above result shows that there is reduced compressor work rate compared to the absorbed heat from the evaporator which made such result improvement. Reduced compressor’s work rate also caused by a decrease in used refrigerant’s ?. This thesis report is organized as a result report and internship that was initiated from June 26 2009 until September 1 2009 at PT. Pertamina
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Lihat Sejarah Pengadaan  Konversi Metadata   Kembali
design
 
Process time: 0.171875 second(s)