Anda belum login :: 17 Feb 2025 11:09 WIB
Home
|
Logon
Hidden
»
Administration
»
Collection Detail
Detail
Performance-Oriented Integrated Control of Production Scheduling
Oleh:
Rong-Lei Sun
;
Han-Xiong Li
;
Youlun Xiong
Jenis:
Article from Journal - ilmiah internasional
Dalam koleksi:
IEEE Transactions on Systems, Man, and Cybernetics: Part C Applications and Reviews vol. 36 no. 4 (Jul. 2006)
,
page 554-562.
Topik:
Feedback Control
;
Performance Feedback
;
Scheduling
;
Supervisory Control
Ketersediaan
Perpustakaan Pusat (Semanggi)
Nomor Panggil:
II69.2
Non-tandon:
1 (dapat dipinjam: 0)
Tandon:
tidak ada
Lihat Detail Induk
Isi artikel
Rule-based production scheduling is analyzed from the perspective of closed-loop control. An integrated feedback control methodology is proposed to enhance the performance of rule-based scheduling. The integrated control system consists of a state feedback control module, a performance-based feedback module, and a supervisory control module. Performance criteria are analyzed and classified into job-related and resource-related criteria. The key factors of performance are identified and used as state variables in the feedback control. The performance-based feedback control compensates for the errors that are caused by the scheduling rules. The supervisory control is designed to enhance the overall performance by adjusting the feedforward gains according to scheduling objectives. Simulation results show that the integrated control scheme can significantly improve the overall performance of the scheduling system.
Opini Anda
Klik untuk menuliskan opini Anda tentang koleksi ini!
Kembali
Process time: 0.015625 second(s)