Anda belum login :: 27 Nov 2024 06:49 WIB
Detail
ArtikelAnalisis Optimasi Pengambilan Keputusan dengan Kendala Pembobotan Fuzzy  
Oleh: Bawono, Baju
Jenis: Article from Journal - ilmiah nasional
Dalam koleksi: Jurnal Teknologi Industri vol. 7 no. 4 (Oct. 2003), page 231-242.
Topik: Fuzzy Constraints; Weighted Aggregation; Weighted T-Norms; Fuzzy Optimization; Soft Decision Making
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: JJ83.4
    • Non-tandon: 1 (dapat dipinjam: 0)
    • Tandon: tidak ada
    Lihat Detail Induk
Isi artikelMany practical optimization problems are characterized by some flexibility in the problem constraints, where this flexibility can be exploited for additional trade-off between improving the objective function and satisfying the constraints. Especially in decision making, this type of flexibility could lead to workable solutions, where the goals and the constraints specified by different parties involved in the decision making are traded off against one another and satisfied to various degrees. Fuzzy sets have proven to be a suitable representation for modeling this type of soft constraints. Conventionally, the fuzzy optimization problem in such a setting is defined as the simultaneous satisfaction of the constraints and the goals. No additional distinction is assumed to exist amongst the constraints and the goals. This report proposes an extension of this model for satisfying the problem constraints and the goals, where preference for different constraints and goals can be specified by the decision-maker. The difference in the preference for the constraints is represented by a set of associated weight factors, which influence the nature of trade-off between improving the optimization objectives and satisfying various constraints. The weighted satisfaction of the problem constraints and goals are demonstrated by using a simple fuzzy linear programming problem. The framework, however, is more general, and it can also he applied to fuzzy mathematical programming problems and multi-objective fuzzy optimization.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)