ArtikelPengkajian Uji Mutu Konstruksi Dalam Rangka Menunjang Desain Dan Pelaksanaan Bendungan Tipe Urugan  
Oleh: Soetjiono, Carlina
Jenis: Article from Journal - ilmiah nasional - tidak terakreditasi DIKTI
Dalam koleksi: Jurnal Sumber Daya Air vol. 3 no. 4 (May 2007), page 29-40.
Topik: Construction control; Design and Specification; Earth or Rock-fill dams
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: SS55
    • Non-tandon: 1 (dapat dipinjam: 0)
    • Tandon: tidak ada
    Lihat Detail Induk
Isi artikelThe safety and satisfactory performance of earth and rockfill dams require and adequate supervision, careful inspection, and testing control. It is the responsibility of the resident engineer to bring to the attention of the engineering division any design or construction detail not adequately covered by the plants and control trequired to accomplish the intent of plans and specifications. The resident engineer must also coordinate the work with design engineers and provide guidance to the contractor if unexpected conditions are discovered during construction. Two primary aspects which need to be considered in the dam construction are the importance of construction control, and the good relation between construction and design. Construction control should ensure that: (1) necessary actions are taken to remedy or allow some unexpected conditions; (2) equipments and procedures are adequate to satisfactory accomplish work; (3) completed structure meets the requirement and intent of plans and specifications; (4) adequate construction records are maintained in the documents and records of construction is completed, the reservoir has been filled, and the dam is functioning satisfactorily. During construction, design engineers should frequently reassess design concepts and assumed conditions in light of actual conditions observed in the field. Consultation with specialists may be required to evaluate unusual problems or foundation conditions. A coordination between design and construction engineers is recommended.