Anda belum login :: 23 Nov 2024 22:32 WIB
Detail
ArtikelAnalisis Ekonomi Perancangan Awal Pabrik Polibutadien Kapasitas 50.000 Ton/Tahun di Indonesia  
Oleh: Wahyuni, Dwi
Jenis: Article from Bulletin/Magazine
Dalam koleksi: Warta Lapan vol. 1 no. 2 (Apr. 1999), page 23-32.
Topik: economical analysis for the preliminary design
Ketersediaan
  • Perpustakaan Pusat (Semanggi)
    • Nomor Panggil: WW32.1
    • Non-tandon: 1 (dapat dipinjam: 0)
    • Tandon: tidak ada
    Lihat Detail Induk
Isi artikelEconomical analysis for the preliminary design of 50.000 ton per year polybutadiene industry was the important factor for the feasibility study of this design . This analysis were about the total investment, the investment sourses, the profit analysis, the cash flow analysis and the finance analysis. The finance analysis were about Pay Out Time (POT), Return On Investment (ROl), Internal Rate of Return (IRR), Break Even Point (BEP) and sensitivity analysis. From the calculation were found: total investment is Rp. 76.673.662.000,- , the POT is 1,8 year, the ROl is 23,29 %, the IRR is 20,45 % and the BEP is 42,6 %. The profit depends on the material and product prices and it does not depend on the investment change and the life time of the project. We can conclude that the project is feasible to be excecuted.This industry also has a good social aspects for the neighbor society.
Opini AndaKlik untuk menuliskan opini Anda tentang koleksi ini!

Kembali
design
 
Process time: 0.015625 second(s)